HAL Opts to Equip All 73 Tejas Mk1A Jets with Israeli Radar and EW Suites as Indigenous Systems Facing Certification Delays

HAL Opts to Equip All 73 Tejas Mk1A Jets with Israeli Radar and EW Suites as Indigenous Systems Facing Certification Delays


In a significant shift impacting India's military self-reliance goals, Hindustan Aeronautics Limited (HAL) has decided to equip its entire run of 73 Tejas Mk1A fighter jets with Israeli-made radar and electronic warfare (EW) systems.

This move reverses a prior commitment to integrate locally developed systems from the 41st aircraft onwards, citing delays in the certification process for the indigenous technology.

The decision affects the integration of the Uttam Active Electronically Scanned Array (AESA) radar and the Swayam Raksha Kavach (SRK) electronic defence suite, both developed by the DRDO.

This development has ignited a debate on the balance between bolstering the Indian Air Force's (IAF) operational readiness and pursuing the national 'Atmanirbhar Bharat' (self-reliant India) initiative in the critical defence sector.

The Tejas Mk1A is an advanced version of the indigenously designed Light Combat Aircraft (LCA), featuring upgraded avionics and weapon systems. It is poised to become a cornerstone of the IAF's fleet, replacing the aging MiG-21 squadrons.

The plan had been to showcase India's growing technological prowess by fitting a significant portion of the new fleet with the homegrown Uttam radar and SRK defence suite, marking a milestone in sovereign defence capability.

However, HAL has now issued a Letter of Intent to the Israeli defence firm ELTA Systems. The agreement is for the supply of the combat-proven ELM-2052 AESA radar and the Scorpius-SP electronic warfare pod for all 73 jets in the initial order.

While the ELM-2052 radars will be assembled in India by HAL through a technology transfer arrangement, the decision to rely on foreign systems for the entire batch underscores the challenges facing the domestic defence ecosystem.

The core issue, according to HAL, lies in the prolonged certification timeline for the DRDO-developed systems. Officials have pointed to difficulties in meeting the stringent reliability and integration standards required by the IAF for combat aircraft.

These delays have created a conflict with the urgent operational need to induct the new fighters into service.

This explanation has been contested by sources within the DRDO, who argue that the Uttam radar had received clearance for production in 2023. They state that the system has successfully completed multiple phases of flight trials and that HAL had been advised to begin subsystem production.

DRDO officials have reportedly requested more time, expressing confidence that the indigenous EW suite would be fully certified before production reached the later batch of aircraft.

The Uttam AESA radar is designed to provide superior target detection and multi-tracking capabilities, while the SRK suite aims to offer advanced protection against missile threats.

The delay in their operational deployment on the Tejas platform highlights a critical gap between development and practical integration, a challenge that India's defence manufacturing sector continues to navigate as it strives for true self-reliance.

The timely delivery of the Tejas Mk1A has also been impacted by separate delays in the supply of F404 jet engines from GE Aerospace in the United States, further complicating the production schedule.
 
If so , so be it, get the jet flying and ready, what nonsense explanation about radars , when there is no engin in sight for next 5 years ,to fullfill this order. So one can go ahead and put a sheeps head as nothing will fly without an engine ,that's unfortunately made in USA and it's in no hurry to supply them.so Israel or whatever is delay till 2030.
 
Till the Tejas comes It will be obsolete.

Aisa lag raha he ki Desh ke andar ke gaddar desh ko atmanirbhar ban ne rok rahe he.

DRDO, HAL me bhi gaddar ho sakte he. Inko dhundh ke sakht se sakht action lena hoga.
 
No hurry; anyway, they are supposed to fit UTTAM radar after producing the first 40 MK1As. We still have plenty of time for that, we know how long HAL will take to produce the first 40 MK1As. It seems now they are planning to fit Israeli radar and Israeli EW in all 83 MK1As.
 
Hope the government steps in and orders an audit for the above action. Such an audit will clearly bring out the reason so that corrective action, if any, can be taken. Need to home in on the lacuna or lacunae in the system and take genuine corrective action.
 
No need to worry, Israeli radars are best, but I hope the next 97 Tejas Mk1A are equipped with Indian Uttam radars and EW suite.
 
If this news is true then this is a major problem. They have been developing the Uttam radar for about 10 years and they have conducted many tests in the air which were all successful. The certification is something they have been working on for ages but it was something that they could easily have completed.

Also developing an indigenous EW and self protection pod is something that we have already developed for our Sukhoi jets so we have a lot of experience and knowledge in developing these advanced pods.
 

Forum statistics

Threads
4,811
Messages
53,733
Members
3,657
Latest member
Srikan52
Back
Top