AMCA Stealth Shaping Finalized, Extensive Research on Stealth Materials Underway

So you haven’t read the CAG report which detailed the lies of DRDO? They literally filed a success report when the project was a complete failure. Didn’t work at all.
Read the report on Dassault or even Naval Group too - consistent defaulter in terms of meeting their investments and tech transfer obligations. Enlighten us with Mirage deal also.
 
It will fly before MRFA tender. Thereafter burden will be on IAF to rationalise their asks.
That’s what they have been promising to MoD since 2014 😂😂That’s why MRFA is so late. ⏰ bus is on them to make a world class jet and do what foreign jets can do. IAF gives them massive concessions anyways.
 
Read the report on Dassault or even Naval Group too - consistent defaulter in terms of meeting their investments and tech transfer obligations. Enlighten us with Mirage deal also.
Please show me where has CAG said that Dassault or even NG ‘defaulted’. Same for Mirage deal. Please show where has anyone said that any unfair practices were used.
 
This is something that would have been done a long time ago. The fighters design, shape, materials to be used, technology and weapons was done before building a prototype so this article is pointless misinformation.
 
So you haven’t read the CAG report which detailed the lies of DRDO? They literally filed a success report when the project was a complete failure. Didn’t work at all.
Har koi gyan deta hai R&D walo ko.. CAG is not having any technical background. This is only report of plan vs actual. That's it
 
DRDO has made good strides, chances of Joining similar project looks grim. Only Foreign Fighter jet procured will b under MRFA .Tempest project will b Minus India.India wants Only Engine development partners & Not partners in developemnt of Fighter jet .
Then Dassault will be out of the race.
 
Better for India to cancel the MFRA and invest the funds in engine avionics and othe technology and infrastructure development
It will take time for the Indian jets, so if MRFA is expensive and not feasible, then we should at-least purchase 1-2 squadrons of 5th gen jets, there is no point of wasting our money on 4 th gen tech, when we already have that capability locally.
 
MRFA is not coming anytime soon. Expect more delays, maybe used aircraft,su30mki Tejas mk1a etc. The main reason is not AMCA, but Tejas II which would be like Rafale in capability with sensor fusion, AI, and etc.
Yes I agree, but they might be waiting for a 5th gen jet also, so they will either drag till that time and buy some used jets to compensate for the retired jets.
 
MRFA is not coming anytime soon. Expect more delays, maybe used aircraft,su30mki Tejas mk1a etc. The main reason is not AMCA, but Tejas II which would be like Rafale in capability with sensor fusion, AI, and etc.
They will try to drag MRFA till Tejas MK2 is ready, until then they might buy used jets, also if IAF likes MK2 they might even ask HAL to stop making MK1A and switch to MK2 instead, only if there is an urgent need or unexpected delays they might go for 1-2 squadrons of some foreign jet in a staggered process depending on MK2 program outcome, all we need is GE-F414, once we start making it, then there won’t be MRFA.
 
Auditor know how to audit.. Not what are technical details.. So audit is yes or no
Auditor is given all the details.

And more importantly, auditor doesn’t need technical knowledge to catch lies. DRDO lied to MoD that the project is successful and hen it was a failure and even DRDO acknowledged it.

So instead of shooting the messenger, shoot the criminals.
 
Auditor is given all the details.

And more importantly, auditor doesn’t need technical knowledge to catch lies. DRDO lied to MoD that the project is successful and hen it was a failure and even DRDO acknowledged it.

So instead of shooting the messenger, shoot the criminals.
This is what I was telling to u.. In design we have to make compromise with respect to dream vs reality vs cost and so on .. So actual design is always much more different than whatever was the initial dream.. Success of designer is not what was designed but it is how well his design is performing on critical parameters
 
So IAF will deter the chinese & p0rk planes with hockey sticks? That is what will happen if you do not give optimum fighters to IAF.
When Impotent Air Force looking for scraps from 3rd world countries, it will better to use new Hockey Sticks by Indian Air Force.
 
MRFA is not coming anytime soon. Expect more delays, maybe used aircraft,su30mki Tejas mk1a etc. The main reason is not AMCA, but Tejas II which would be like Rafale in capability with sensor fusion, AI, and etc.
So it will be better to fuel more money and order at least 15 Sqn minimum for MK1A, MK2, AMCA and ORCA for IAF and 150 Tedbf considering minimum 4 CBG
 
Then Dassault will be out of the race.
In your dream...A Screwdrivers for LM and Boeing...By the way, it's time to work on the 6th generation....NGAD....Tempest (comme from the French word Tempete), and of course the SCAF, a failure to be...
 
So you haven’t read the CAG report which detailed the lies of DRDO? They literally filed a success report when the project was a complete failure. Didn’t work at all.
Auditors ko achche se nashta na karao to wo bura maan jaate h aur agar khatirdaari kar do to sab badhiya badhiya likh dete h 😂
 
It will take time for the Indian jets, so if MRFA is expensive and not feasible, then we should at-least purchase 1-2 squadrons of 5th gen jets, there is no point of wasting our money on 4 th gen tech, when we already have that capability locally.
Indeed, the F-35 is the best choice....No worries, no need to developp your own jets, simply a screwdrivers for the Anglo-saxon...
 

Forum statistics

Threads
3,303
Messages
25,947
Members
1,367
Latest member
Neil B.
Back
Top