DRDO Developing 350km Range M3 Missile under Project Kusha to Counter Mach 7 ASBMs, Offering Upper-tier Ballistic Missile Defence

DRDO Developing 350km Range M3 Missile under Project Kusha to Counter Mach 7 ASBMs, Offering Upper-tier Ballistic Missile Defence


India's Defence Research and Development Organisation (DRDO) is significantly advancing the nation's air defence shield through Project Kusha, a high-priority initiative focused on creating an indigenous long-range surface-to-air missile (SAM) system.

A critical aspect of this project, according to released details, is its capability to intercept and neutralise very high-speed anti-ship ballistic missiles (ASBMs) travelling at up to Mach 7 (seven times the speed of sound), representing a major step forward in India's indigenous defence technology.

Named after a revered figure from Indian epics, Project Kusha, also known technically as the Extended Range Air Defence System (ERADS) or Programme Long Range Surface-to-Air Missile (PGLRSAM), is engineered to fill a crucial operational gap.

It will position India's capabilities between its current Medium-Range Surface-to-Air Missile (MR-SAM) system, which has an 80 km range, and the Russian S-400 Triumf system, effective up to 400 km.

The Project Kusha system will feature three distinct interceptor missiles: the M1 with a 150 km range, the M2 reaching 250 km, and the M3 designed for a 350 km engagement range. These are anticipated for deployment with the Indian Air Force (IAF) and the Indian Navy between 2028 and 2029.

A prominent element of Project Kusha is the naval version of its M2 missile, specifically designed to counter ASBMs moving at extreme speeds of Mach 7 (approximately 8,645 kilometres per hour). This capability is increasingly vital for safeguarding naval assets against the sophisticated, high-speed ballistic missiles being developed globally to target warships.

The system's effectiveness will be supported by advanced long-range surveillance and fire control radars. The interceptor missiles themselves will be equipped with Active Electronically Scanned Array (AESA) seekers, complemented by infrared (IR) and radio frequency (RF) guidance systems, ensuring precise targeting and high agility to engage threats effectively.

Currently, the M1 interceptor missile is in the manufacturing stage and is slated for testing in the near future. The development of its prototype is expected to be finalised within 12 to 18 months, which will be followed by extensive user trials lasting between 12 and 36 months.

The M1, which leverages the airframe design of the existing Akash-NG missile, possesses a 150 km range and can achieve speeds of Mach 5.5. It is designed to be effective against a wide array of aerial threats, including stealth fighter aircraft, cruise missiles, unmanned aerial vehicles (drones), and precision-guided munitions. The M2 and M3 interceptors are currently in advanced stages of development.

The M3 missile, with its extended range of 350 km, will be capable of targeting larger, high-value aerial platforms such as Airborne Warning and Control Systems (AWACS) and will also provide a significant short-to-medium-range ballistic missile defence (BMD) capability, contributing to an upper-tier defence layer.

The development of Project Kusha is a collaborative venture, with Bharat Electronics Limited (BEL) serving as a principal development and integration partner. BEL is concentrating on critical subsystems, including the radars and advanced control systems.

A key strength of the Kusha system will be its interoperability with the Indian Air Force’s Integrated Air Command and Control System (IACCS) and the existing S-400 missile systems. This integration facilitates the sharing of radar data and enables coordinated interception strategies, thereby enhancing overall operational efficiency.

Project Kusha is designed to achieve a single-shot kill probability of at least 80%, rising to over 90% when missiles are fired in a salvo, promising a robust addition to India’s multi-layered air defence structure.

The Cabinet Committee on Security officially sanctioned Project Kusha in May 2022, allocating a budget of Rs 21,700 crore (approximately US$2.6 billion) for an initial procurement of five squadrons intended for the IAF.

The project draws upon technological expertise and proven missile structures from India’s established Ballistic Missile Defence programme, aiming to optimise development costs and timelines.

For the Indian Navy, the naval variant's capacity to intercept Mach 7 ASBMs will substantially bolster the protection of its frontline warships against advanced missile threats, supplementing existing naval air defence systems like the Barak-8 and the indigenous Naval Ballistic Missile Defence System.
 
India should order few more S400 systems because our own Kusha system is still 5-6 years away...India needs to guard threats from both China and Pakistan....
 
India should order few more S400 systems because our own Kusha system is still 5-6 years away...India needs to guard threats from both China and Pakistan....
Agreed but why not sign up S500 joint manufacturing which russia offered. In exchange we can give russia whatever they need
 
So M1 interceptor of Project Khushal will be ready after 5 years? 12 to 18 months' development and then 12 to 36 months' trials. Better to order more S-400 if they can deliver before 5 years.
 
This will be best in class. After US Israel and Russia India will be seen in top air defence system producers.
 
We have to 100% indigenously design, develop and manufacture this SAM as it is a very critical and modern air defence system which will make us self reliant. While we are only developing 3 missiles they should actually develop another missile but with a longer range than 400km as this will give us an advantage. Once production starts they should reinforce the border with China first.
 

Forum statistics

Threads
5,257
Messages
52,583
Members
3,427
Latest member
ROYSHAAN
Back
Top