
India's pursuit of a cutting-edge air defence network has gained significant momentum with Project Kusha moving into a new phase.
This ambitious initiative by the Defence Research and Development Organisation (DRDO) aims to develop a homegrown Long Range Surface-to-Air Missile (LRSAM) system – a potent answer to India's need for comprehensive long-range aerial threat neutralization.
Project Kusha: Key Details
- Focus: Project Kusha aims to provide the Indian Air Force (IAF) with a robust tool to intercept a wide spectrum of airborne threats, including stealth fighters, conventional aircraft, ballistic and cruise missiles, precision-guided munitions, and unmanned aerial vehicles (UAVs).
- Range: The LRSAM system under Project Kusha is envisioned to have an impressive range of nearly 350 kilometers.
- Multi-Tiered Approach: Previous reports and leaked tender documents suggest that Project Kusha will adopt a multi-layered defence strategy. This could involve at least two new missiles with ranges of 150km and 250km, and potentially a third missile with the maximum 350km reach, providing a flexible and comprehensive shield.
Progress and Timeline
According to official sources, Project Kusha has successfully completed its design phase.This crucial step paves the way for the development and fabrication of vital components that will bring the LRSAM system to life. The ambitious project targets a completion timeline of 2028-29 for testing and induction, with the development phase likely to kick off in 2025-26.
The Significance of Project Kusha
The 'Desi S-400', as it's sometimes dubbed, highlights India's determination to bolster its indigenous defence capabilities. A successful outcome of Project Kusha would significantly enhance the Indian Air Force's power to protect the nation's airspace.The development of these advanced missiles promises to reduce reliance on foreign systems and boost self-sufficiency in the defence sector.
The Road Ahead
While Project Kusha has made a positive stride, the journey ahead involves rigorous testing and refinement phases. Meeting the tight deadline will require a concerted effort from DRDO and its partners.With the design phase behind it, Project Kusha is steadily transforming into a tangible reality, set to profoundly augment India's air defence capabilities in the years to come.