DRDO's 'Project Kusha' to Equate S-500 Capabilities with Hypersonic and Low-orbit Satellite Interceptors, Induction On Track by 2028

DRDO's 'Project Kusha' to Equate S-500 Capabilities with Hypersonic and Low-orbit Satellite Interceptors, Induction On Track by 2028


India's indigenous long-range air defence system, 'Project Kusha', is being developed to match the capabilities of Russia's next-generation S-500 "Prometey" system, DRDO chief has confirmed.

This ambitious project aims to provide the Indian Armed Forces with a powerful shield against advanced aerial threats, including stealth fighters, hypersonic missiles, and low-orbit satellites, with deployment scheduled to begin by 2028.

In a significant clarification, Dr. Samir V. Kamat, Chairman of the Defence Research and Development Organisation (DRDO), stated that Project Kusha represents a far greater technological leap than initially perceived. He dismissed direct comparisons to the S-400 Triumf, which India has already inducted.

"It would not be accurate to compare Kusha with the S-400. It is closer in technological scope and operational intent to Russia’s S-500,” Dr. Kamat explained. This positions the made-in-India system in an elite category, as the S-500 is designed to counter the most sophisticated aerospace threats.

Project Kusha is a critical component of India’s multi-layered ballistic missile defence (BMD) architecture. The system will feature three distinct types of interceptor missiles with operational ranges of 150 km, 250 km, and up to 400 km. These will be guided by advanced long-range surveillance and fire-control radars, capable of detecting and tracking targets from extended distances.

The entire system will be integrated into the Indian Air Force's (IAF) Integrated Air Command and Control System (IACCS), creating a seamless and unified air defence network.

The development timeline for this strategic project is on a fast track. A prototype of the system is expected to be ready within the next 12 to 18 months, followed by a period of comprehensive user trials.

The first units are planned for induction into the Indian Air Force and Indian Navy by 2028-2029. Fabrication of the initial batch of the 150 km-range 'M1' interceptor is already underway.

The strategic importance of Project Kusha is magnified by the fact that Russia's S-500 system, known for its ability to destroy hypersonic weapons and satellites, is not currently offered for export. By developing an equivalent system domestically, India is ensuring strategic autonomy and self-reliance in a critical area of national security.

The project, first approved in 2022, also represents a major advancement in India's sovereign defence-industrial capabilities, particularly in sophisticated radar, seeker, and propulsion technologies.
 
Great news! Some cartoons a few days ago were saying Kusha will not be cost-effective and will not match similar Air Defence systems in the export market. In fact, now with half the price, it will eat market share in the export market of Air Defence systems. Great work by DRDO.
 
This is an essential requirement and we have to 100% indigenously design, develop and manufacture it. On an average SAM you usually have four missiles per truck and we are only developing 3 new missiles with the M1, M2, M3.

It would make more sense to develop a longer range missile that’s greater than 400km. This would give us a major advantage over the S400 and we can eventually replace it.

We also need to make sure that this SAM is compatible and it can be installed and integrated with our existing air defence network and system. This will protect our air space from jets, missiles and drones which are a major threat etc.
 

Forum statistics

Threads
4,646
Messages
52,685
Members
3,542
Latest member
alinaharvard45
Back
Top