You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an alternative browser.
You should upgrade or use an alternative browser.
ADA Tejas Mark II: India's Next-Gen Fighter - Discuss the Future!
- Thread starter Manav Rastogi
- Start date
Regular
- Messages
- 574
- Reactions
- 8
- Points
- 1
Duggal Saab aaj "Gear up" kar rahe hain.
Regular
- Messages
- 574
- Reactions
- 8
- Points
- 1
Let HAL canteen gear up first.Let Tejas MK2 prototype gear up fast.
Regular
- Messages
- 574
- Reactions
- 8
- Points
- 1
If left to HAL, yeah. In high quality 3D renders.Many squadrons can be established!
Member
- Messages
- 70
- Reactions
- 0
- Points
- 1
#EkKoDas - DasKoPachhas - PacchasKoHazaar
Phir se.....Hainnn. Ab bas kar de❗ Baar-baar likhne se time compression/time dilation hota hai kya. 2028-29 tak induction ho jayega ❓❓❓ Give HAL, ADA & "us" some breathing space, bhai. It is a long drawn process and no one should cut corners in the name of "Gearing Up-Down-Left-Right" The Cabinet Committee on Security had cleared the LCA project in September 2022.
Prabhulla Chandran VK, director of avionics and weapons systems at the ADA:
timesofindia.indiatimes.com
Phir se.....Hainnn. Ab bas kar de❗ Baar-baar likhne se time compression/time dilation hota hai kya. 2028-29 tak induction ho jayega ❓❓❓ Give HAL, ADA & "us" some breathing space, bhai. It is a long drawn process and no one should cut corners in the name of "Gearing Up-Down-Left-Right" The Cabinet Committee on Security had cleared the LCA project in September 2022.
Prabhulla Chandran VK, director of avionics and weapons systems at the ADA:
India News: The much-delayed, India-made Tejas Mk 2 light combat aircraft (LCA) could be ready for its maiden flight by 2025 with an American engine, according to
Member
- Messages
- 114
- Reactions
- 3
- Points
- 1
First Flight in 2026
Development Trials will finish by 2032
Orders Placed by 2034
First 2 aircrafts in 2036
It will be outdated before even born.
Turkey/South Korea will have 5th Gen Fighter by then produced and in service and India will be "developing, gearing"
Development Trials will finish by 2032
Orders Placed by 2034
First 2 aircrafts in 2036
It will be outdated before even born.
Turkey/South Korea will have 5th Gen Fighter by then produced and in service and India will be "developing, gearing"
Regular
- Messages
- 277
- Reactions
- 4
- Points
- 1
Mk2 will be expedited as it is based on Mk1 and is tested. Likely by 2032 itself it will undergo mass productionFirst Flight in 2026
Development Trials will finish by 2032
Orders Placed by 2034
First 2 aircrafts in 2036
It will be outdated before even born.
Turkey/South Korea will have 5th Gen Fighter by then produced and in service and India will be "developing, gearing"
South Korea and turkey have imported their jet from the parts and technology they bought from the USA and have developed little themselves. India is developing a brand new design and technology by itself for the AMCA jets.First Flight in 2026
Development Trials will finish by 2032
Orders Placed by 2034
First 2 aircrafts in 2036
It will be outdated before even born.
Turkey/South Korea will have 5th Gen Fighter by then produced and in service and India will be "developing, gearing"
Member
- Messages
- 218
- Reactions
- 2
- Points
- 1
Who gives fukkkSouth Korea and turkey have imported their jet from the parts and technology they bought from the USA and have developed little themselves. India is developing a brand new design and technology by itself for the AMCA jets.
Point is they have done it and improve what they have achieved
This is a critical necessity that we need to design and develop as quick as possible. It's good that they are already placing orders for any equipment, parts, components and technology they can before full production takes place. As soon as they clear the F414 engine deal then they can manufacture a set of prototype.
Member
- Messages
- 218
- Reactions
- 2
- Points
- 1
These are not any jigs and fixturesJigs and fixtures are just some high tolerance welded steel structures. Makes it sound something so high tech
These are special using cutting edge technology and alien metal
The point is that they are manufacturing a much inferior jet by a licensed copy of the F35 jet. Difference is that we are developing it ourselves to be truly self reliant.Point is they have done it and improve what they have achieved
Member
- Messages
- 218
- Reactions
- 2
- Points
- 1
When?we are developing it ourselves to be truly self reliant.
2035 2045 2055 2065
How do you know it’s a much inferior jet?
Regular
- Messages
- 262
- Reactions
- 4
- Points
- 1
HAL should make 126 Tejas-AF-MK-II, 126 AF-MK-II with internal weapon bay and 145 twin engine ORCA ! Twin engine ORCA should also be used as test bed for GTRE Kaveri (75-80 KN ) engine !
Member
- Messages
- 29
- Reactions
- 0
- Points
- 1
After watching for so many years & with past experiences we can say this. now nobody believes HAL that it will stick to it's timelines
Latest Replies
-
India's Nuclear Journey: A Story of Isolation to Recognition
- Latest: Santosh1976
-
Indian Navy Seeks Low-RCS Stealth Upgrade for Heavy Frigates to Counter Sea-Skimming Threats
- Latest: Pirthpall Sekhon