HAL Completes Six Tejas Mk1 Trainers Production, Will Use Older F-404 Engines to Deliver Them by March 2025

GceSqpsaMAAgjra.jpg


Hindustan Aeronautics Limited (HAL) has announced the completion of production for six Tejas Mk1 Trainer aircraft, reaffirming its commitment to deliver these crucial assets to the Indian Air Force (IAF) by March 2025.

Despite facing global supply chain challenges, HAL has implemented a resourceful solution to maintain its production schedule.

Supply chain disruptions, particularly delays in the delivery of F-404 engines, posed a potential obstacle to HAL's production timeline. However, HAL has proactively addressed this challenge by utilizing older, Category B F-404 engines in some of the trainers.

This strategic decision ensures that the aircraft are delivered on schedule, allowing the IAF to commence pilot training without delay. These interim engines will be replaced with newer, more advanced engines as they become available, ensuring the long-term performance of the aircraft.

The IAF placed an order for 18 Tejas Mk1 Trainers in 2021 to bolster its pilot training program. These dual-seat aircraft are instrumental in preparing pilots for the advanced Tejas Mk1A variant, enabling them to familiarize themselves with the aircraft's unique avionics and operational characteristics through comprehensive simulations and live flight exercises.

This development is a significant boost for the IAF, which is actively working to strengthen its indigenous fleet and enhance its training capabilities. The Tejas Mk1 Trainer offers a modern and cost-effective training solution compared to legacy platforms, allowing the IAF to maximize pilot flight hours and optimize training efficiency.
 
These trainers were supposed to be delivered by Mar 2023. Today is Nov 2024 and they will be delivered by Mar 2025. And this is being touted as a great job….
 
It’s great if the jets actually get manufactured and delivered on time. HAL should continue producing the jets whether the engine is there or not. The engine can always be installed on the jet when they arrive. Delaying the production just for the engine will delay the entire order number.
 

Forum statistics

Threads
3,259
Messages
32,912
Members
1,989
Latest member
villagetalkies
Back
Top