When can the Mk1A reach the production rate of 24/30? Probably, 2029 By then I think it should be close to completing the initial order for 83. Then there is a pending order for 97. If we take it by 2032 then m1a would be done with production and the line could be shifted to Mk2. I do not see any significant production or hopes for mk2 before this. Probably the same time Mk2 is supposed to be in production, another foreign-designed fighter should be in production as well. Now to say with hope, HAL successfully manages to put a separate production for TEDBF and Even AMCA too by 2032, especially considering the current rate is poor even after a decade of IOC, needs you either be a fanatic or a kid