Regular
- Messages
- 906
- Reactions
- 1
- Points
- 1
AMCA is 4.8gen not even a 5gen on paper plus CGI LMAO 😹😹😹AMCA MK1 is 5.5 Gen & AMCA MK2 may have some upgraded 6th Gen Tech .
AMCA is 4.8gen not even a 5gen on paper plus CGI LMAO 😹😹😹AMCA MK1 is 5.5 Gen & AMCA MK2 may have some upgraded 6th Gen Tech .
Turkish Kaan and Korean's Boramae are flying it's mk1a prototype now they are already readying their mk2 version😹😹😹😹Turkey is flying KAAN... meanwhile HAL has ambitious target of first flight by 2028
Kakakakak 😹😹😹Turkey is flying a glorified RC model - a country which had never developed a 4 gen fighter itself in its lifetime will develop a 5th gen in 5 years - nice dreams. Turkey is just copying the same CCP route --- only sound & no substance in attempt to capture the potential mullah market for 5th gen fighters. Erdogan has to show something to remain relevant. The TB2's fate in Russia showed only how much Turkish engineering can do
HAL restructuring is more important than DRDO.Why do people fail to understand, AMCA prototype testing is by 2028. Which means youtubers and defence bloggers will get a clear fixed image of AMCA life size model. After that we have our HAL, they will delay the production as much as possible. Maybe 2050 by then I will be old and many in this blog will not live to see AMCA in service.
I am more optimistic. I believe 10-12 years is enough for AMCA to enter productionEven AMCA will take 14-15 years to enter production, if there are no major tech challenges.
Have you ever wondered that CCS cleared the use of funds for prototyping only a month ago?AMCA by 2028?? its not an ambitious target but a wishfull dream at the most.. a 5th gen fighter ... who is he trying to mislead?. if he really said that. All these gov bearcats utter some nonsense to get attention and then retire and go away while the indian public is being mislead. NO accountability. The first flight of the lca mk2 itself is being planned for first flight 4 yrs from now .
No as the intake is followed by a serpentine tunnel leading to the engine so the blades won't receive any radarwavesWhy the air intakes protruding out, won't it increase it's radar sign?
To be fair the funds were'nt released up until now.
That's the problem. You save a few billions buying junk but then u pay the most expensive price for it.We bought what we could afford.
They were not the only sellers in the market. Ther was France UK germany Italy Spain south africa othersUSA was not offering India anything. They were supporting Pakistan from day 1.
amca mk1 prototype isn't coming before 2033Make it after 2045, the MK2 itself is unlikely to enter production anytime before 2033, and you expect them to suddenly succeed in producing AMCA, which has drastically expanded technology scope?
During development phase more HAL engineers and scientists were working on AMCA as compared to ADA. And HAL is also the manufacturing partner for prototypes which means HAL is in charge of production of prototypes as well, and will be coordinating with all other agencies and vendors. Indeed, read the fine print carefully.HAL is not at helm till prod versions are readied. Read the fine print carefully
Did you realize that it took 16 years to submit documents for fund release by CCS (design phase) and less than a year to clear that file?Have you ever wondered that CCS cleared the use of funds for prototyping only a month ago?
At least they are flying something unlike us who is taking 20+ years even for LCA mk2. And TB2 was hugely successful. It did the job it was made to do-destroy targets and provide surveillance in uncontested airspace. That stopped the entire Russian army from proceeding.Turkey is flying a glorified RC model - a country which had never developed a 4 gen fighter itself in its lifetime will develop a 5th gen in 5 years - nice dreams. Turkey is just copying the same CCP route --- only sound & no substance in attempt to capture the potential mullah market for 5th gen fighters. Erdogan has to show something to remain relevant. The TB2's fate in Russia showed only how much Turkish engineering can do
The papers for release of funds were submitted less then a year back. After the defense budget was approved. So GoI actually took money from contingency funds and approved them. Compare that to 16 years they took to submit the papers in the first place.Why the air intakes protruding out, won't it increase it's radar sign?
To be fair the funds were'nt released up until now.
By the time world is on 7th Generation, we will be having 5.5 Version, hard truthAn unfortunate truth, but we do need to join one of these 6th generation programs. Otherwise, we'll be stuck playing catch-up for the next couple of decades.
Yea, indigenous product but main heart the engine being imported from other countries, we have become a laughing stockDear lord! about time we stop this madness. We are struggling to produce LCA MK-2, a patently 4-4.5 generation fighter, and we are having wild fantasy for developing 6 generation fighter, when we cant even produce Tejas MK-2 on time. If we continue this way, we will become the laughingstock of the world and will be ridiculed for this madness.